Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 26 - Aug 31
Reserve from the case
Ships within 48 hours · Estimated delivery Aug 26 - Aug 31
and ultra high-temperature Neodymium magnets for a great blend of power and long-life
This is the ESU 58429 Loksound V5 Dcc Blank Decoder 21 Pin MTC Nem660
and 99 seconds
Set contains 6 pieces
Brand: OS Engines
Walthers Cornerstone 933-3813 N Sanding & Drying House - Kit E-Revo 2.0 (86086-4) - Upgrade Parts and ultra high-temperature Neodymium magnetsSanding Tower & Drying House is Ideal for Every Era The Walthers Cornerstone Sanding Towers and Drying House kit is essential for adding realism to steam and diesel era locomotive servicing scenes. Every railroad had its own ideas about sand house construction, so most were built to meet local conditions and seldom followed standard plans. Since diesels also needed sand, these structures remained in service years after the last steamer had been
Pay in 4 interest-free payments of $16.25 Learn more