Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
Reserve from the case
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
split 1 suction line to 2 pumps
operation hours and power on/off
The pump is a cast iron submersible pump with integrated submersible 1-phase motor
DDC 15-4 AR-PV/T/C-F-32I002FG The SMART Digital DDC is a compact positive displacement
The Grundfos CMBE booster is a compact booster system for water supply in domestic applications
pressure loading valves 95730755 split 1 suction line toPressure loading valves provide a constant counter pressure and prevent siphoning They are installed in the discharge line after the pressure relief valve, and after the pulsation damper, if fitted.
US$ 25.00
US$ 16.00
US$ 25.00
US$ 12.00
US$ 70.00
US$ 40.00
US$ 23.00
US$ 30.00
US$ 15.00
US$ 18.00
US$ 15.00
US$ 15.00
Pay in 4 interest-free payments of $43.31 Learn more